Employee Philosophy  
Mechanical Electrical Lighting Technology Sustainable Design Building Commissioning
Hospitality Commercial Recreation Public Healthcare Educational Residential Lighting Design Sustainable Design
Beaudin Ganze Consulting Engineers Dobson Penrose Electrical Penrose Mechanical Summit Sundeck Wagner Park Christiania  
Conferences Seminars Press Releases  
Beaudin Ganze Consulting Engineers
Return to Home Page About Us Expertise Experience Awards News and Publications Recruiting Search Our Site Contact Us
Beaudin Ganze
Beaudin Ganze Consulting Engineers
Christiania Awards :: Beaudin Ganze Consulting Engineers
Consulting Engineers
Change your text size. Change your text size to small Change your text size to medium Change your text size to large Change your text size to largest Change your text size/

Christiania Building
Beaudin Ganze Consulting Engineers

Christiana Building
Christiania Building
Christiania Building
Christiania Schematic

ACEC Colorado 2003 Grand Conceptor Award

A SYSTEM FOR ALL SEASONS

Ketchum, Idaho

The Future of Heat Rejection

  • Breakthrough snowmelt/condenser heat rejection system
  • Worldwide snow country application
  • Significant energy savings by optimizing standard equipment
  • Sustainable year-round use of snowmelt system for heat rejection
  • Redefined geothermal heat rejection use and application

System Innovation

  • Unique integration of snowmelt and geothermal heat pump systems
  • First dual use snowmelt/heat pump heat rejection system
  • Snowmelt system provides summer cooling system heat rejection
  • Eliminated deep excavation time and cost for geothermal loop system on landlocked site
  • Building waste heat augmented snowmelt system

Complexity

  • Strategic use of climatic conditions (40°F temperature swings) with heat rejection system
  • Augmented snowmelt heat rejection system with reduced size cooling tower
  • Digital control system to optimize operation
  • Uses low cost pump energy in lieu of more costly (up to six times) cooling tower fan energy
  • Cooling tower serves as garage exhaust and eliminates garage exhaust fan

Safety & Savings for Public & Environment

  • Reclaimed building waste heat making snowmelt system earth-friendly
  • Reduced fossil fuel consumption by utilizing waste heat
  • Reduced cooling tower run time and noise pollution by 90%
  • Reduced electrical cost in summer
  • Reduced gas and electrical cost in winter
  • Increased snowmelt areas thus improving public safety

Owner Return

  • Reduced installation costs (7%) by eliminating snowmelt boiler and garage exhaust fan
  • Reduced system spatial needs resulting in building costs savings
  • Reduced condenser operating costs by up to 85%
  • Eliminated snow maintenance and storage

“System kept up with worst heat wave in past decade”

Jack Bariteau
Christiania, LLC

 

Consulting Engineers