Employee Philosophy  
Mechanical Electrical Lighting Technology Sustainable Design Building Commissioning
Hospitality Commercial Recreation Public Healthcare Educational Residential Lighting Design Sustainable Design
Beaudin Ganze Consulting Engineers Dobson Penrose Electrical Penrose Mechanical Summit Sundeck Wagner Park Christiania  
Conferences Seminars Press Releases  
Beaudin Ganze Consulting Engineers
Return to Home Page About Us Expertise Experience Awards News and Publications Recruiting Search Our Site Contact Us
Beaudin Ganze
Beaudin Ganze Consulting Engineers
Case Studies of Beaudin Ganze Consulting Engineers

  Engineering

      Navigation...

Consulting Engineers
Change your text size. Change your text size to small Change your text size to medium Change your text size to large Change your text size to largest Change your text size/
     

Brush Creek Village

 
  Project:   Resort Development
Owner: Intrawest
Client: Intrawest
Location: Snowmass, Colorado
Architect: OZ Architecture, 42|40 Architecture, Cottle Carr Yaw Architects
Project Size: 618,285 SF

At Issue

BGCE is providing mechanical and electrical engineering design/build scope definition, consultation (Owner’s Representative) during the construction document phase, and construction review services for this mixed-use resort village base facility in Snowmass Village, Colorado. New construction for Phases 1 & 2 of the project will include approximately 293,684 SF of residential; 37,414 SF of shell commercial; 74,403 SF of skier services; 32,244 SF of community facilities; and 180,540 SF of below-grade parking garage. In addition 150,000 SF of site will be snowmelted. BGCE is the sole MEP engineer and is coordinating with three different Architectural teams to produce the ten different buildings this project comprises.

These facilities will be served by one central boiler/chiller plant which will include:

  • 14 condensing boilers

  • Two variable-flow chillers for added efficiency, two cooling towers, and flate plate for cooling

  • Primary and secondary pumping for both cold and hot water

  • Domestic water heaters employ additional heat exchanger in order to lower the return water heating temperature and modify the required condensing temperature of the boiler system

  • Diesel exhaust system for garage, through which public bus systems transits

Consulting Engineers
Consulting Engineers
[+] click photos to enlarge
Brush Creek Village
Consulting Engineers

 

Consulting Engineers